OUR SERVICES
Residential Installation

Guide to Home Elevator Installation Process.

Your home is the dwelling for your family, it is security and assurance, it is the gathering for memorial moments, holidays and events.

Now, you have decided to increase the comfort, culture and value of your home by adding a “Home Elevator.”

Let’s discuss the Installation Process.
Valor Lift Elevators, LLC makes the Home Elevator Installation Process seemingly effortless.

Whatever your reasons for wanting to get an elevator installed at home, knowing what happens in an elevator installation process and how long it will take can help you plan your next remodeling or renovation project to fit into your life and schedule.

How Is A Home Elevator Installed?

The process of installing a home elevator can vary based on a few factors, such as the design of the home and the preferences of the homeowner. The installation also depends on the age of the home. If you’re building a new home from scratch, you can incorporate an elevator into the blueprints and install it as part of the building. An older or existing home can be evaluated as to the best placement of elevator.

Residential Elevator Installation:
Types of Elevator Installation Properties:
Multiple Story Homes
Townhomes
2 Story Homes
Townhomes

Elevating Houston, one floor at a time

PRE-INSTALLATION CHECKLIST FOR A RESIDENTIAL ELEVATOR

Valor Lift Elevators Installation Team will go over with you specific information before an elevator is ordered, shipped and work is started. Is the Elevator going in an Open Space or in a Closet?

We can install the elevator anywhere (Living Room, Family Room, Dining Room, Study, Office, Hall Closet, Storage Closet, Laundry Room, Open Area, Center, Left, Right or Croner Space or Outside the Home/Attached)

Valor Lift Elevators LLC offers a traditional selection of Cabins to Install – All Glass, Woodgrain, and Stainless. Elevator Cabin Accessories Installation – LED Lighting, Glass Coloring Options, Double Swing Doors, Single Swing Doors, Cabin Etching Panels.

Installation Technical Overview:

Site Evaluation:
Hoistway Construction:
Rail Installation:
Cab Assembly:
Door Installation:
Hydraulic Power Unit (if applicable):
Control System Wiring:
Final Steps:
Testing and Adjustment:
Finishing Touches:

Before: Design, Planning, Production and Assembly

After: Complete Installation

THE ARRIVAL OF THE ELEVATOR

Valor Lift Elevators, LLC, will have your elevator shipped to you or your elevator is shipped to a select warehouse that we pick up and deliver. We will need a dedicated workspace to break down boxes and begin to install elevator.

HOW LONG DOES A HOME ELEVATOR INSTALLATION TAKE?
Home Elevators Simplify Living
Installation Process Made Easier